-
Miller Spectrum 875 Plasma Cutter w/20 ft. Torch 907583
Miller Spectrum® 875 Plasma Cutter w/20 Foot XT60 Torch 907583 Miller Spectrum® 875 Plasma Cutter with 20 foot XT60 torch has compact size but 60 amps of output power. It features easy operator controls, for optimum cutting and gouging performance.
-
GROVE GMK6300L-1 | All-Terrain Cranes
The Grove GMK6300L-1 is stronger than the GMK6300L. Improved load charts especially on long boom applications and large lifting capacities are the main advantages of this crane compared to the GMK6300L. Further benefits of Grove’s GMK6300L-1 are increased
-
13 Pricing Strategies for Finding the Ideal Price
Selling price = Cost (mark up) Selling price = $45 (1.35) Selling price = $60.75 Pros: The upside of cost-plus pricing is that it doesn’t take much to figure out. You’re already tracking production costs and labor costs. All you have to do is add a percentage on top
-
Project Management for Construction: Cost Estimation
TABLE 5-2: Unit Prices in Two Contractors' Bids for Roadway Construction Items Unit Quantity Unit price 1 2 Mobilization ls 1 115,000 569,554 Removal, berm lf 8,020 1.00 1.50 Finish subgrade sy 1,207,500 0.50 0.30 Surface ditches lf 525 2.00 1.00
-
Cost to Install Water Line - 2021 Cost Calculator
For a basic project in zip code 47474 with 1 piping run, the cost to Install a Water Line starts at $493 - $612 per piping run. Actual costs will depend on job size, conditions, and options. To estimate costs for your project: 1. Set Project Zip Code Enter the Zip Code for the location where labor is
-
Auto, Boat and Aircraft Manufacturers For Sale - BizBuySell
Line and Landing services – fueling (Jet-A and 100LL), pilot's lounge For more information please contact Charlie MacPherson, Business Broker with Inbar Group, Inc. via cmacpherson@inbargroup.com or 207-352-1000. • Asking Price: $2,500,000 • Assets
-
Public works projects under budget for White City in 2020
White City’s public works department reported its capital projects completed in 2020 came in under budget on the whole. A new parking area at the Fernwood Park pickleball and tennis court facility was added for $8,000, half of the budgeted $16,000. Another significant saving came with the installation of LED pathway light upgrades, where the project came in $4,100 under budget at $22,400
-
What are the New Features of OpenShift 4? - Whizlabs Blog
Red Hat OpenShift Container Platform 4 provides a scalable, robust, and flexible runtime environment for the deployment of cloud applications. Let’s bring a light on the OpenShift 4 new features through this discussion. OpenShift is an open-source as well as an extensible container application platform developed by Red Hat.
-
Line 2 Bloor–Danforth - Wikipedia
Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC).[3] It has 31 stations and is 26.2 kilometres (16.3 mi) in length. It opened on February 26, 1966,[4][5] and extensions at both ends were completed in 1968 and again in 1980. The line runs primarily a few metres north of
-
Automatic Waste Segregation Machine | Garbage
Automatic waste segregation machine belongs to large scale equipment to manage waste. This machine can separate different wastes into several kinds of resources automatically, like plastic, construction materials, organic matter, metal, etc.It not only handles
-
Green Machine - Recycling Equipment Manufacturer
Green Machine is the only fully-integrated recycling systems manufacturer that offers everything in-house from design, fabrication, pre/post installation, and locally available replacement parts. Cut out the middleman and see higher returns!