-
SC-12 Road Marking System | Skip-Line by Spec-Rite
The Skip-Line SC-12 Road Marking Vehicle Control System The new SC-12 Control System is the most advanced skip timer on the market! The SC-12 provides advanced striping and truck control capabilities by creating a single, integrated electronic system for nearly the entire striping truck.
-
CHAPTER 6 ROAD CONSTRUCTION TECHNIQUES
The method and equipment used in road construction is an important economic and design factor in road location and subsequent design. A road to be built by an operator whose only equipment is a bulldozer requires a different design than a road to be built by a contractor equipped with hydraulic excavator, scrapers, and bulldozer.
-
Line striping mounted systems - Truck mounted line stripers
Double Sided Striping System RM HD double sided beam, allows you to easily, without any tools, to move the arm bracket left or right of the vehicle. Optionally the RM HD can be provided with two arm brackets for simultaneous road marking. Fully Retractable Chassis - Brackets Fold the entire system within the trucks deck.
-
Road Markings & Markers Method Statement - Best Editable
Plant & Equipment for Road Markings Activity. The major equipment for this construction works includes, but are not limited to the followings; Pavement Marking Equipment; Process Monitoring Equipment 1. Portable environmental measuring devices for temperature & humidity 2. Paint application rate computers 3.
-
Road-Building Machines - Ministry of Transportation
Jun 23, 2021 · Road-building machines are designated as slow-moving vehicles and subject to Section 76 of the Highway Traffic Act and Regulation 616 (Slow Moving Vehicle Sign). Must display a slow-moving vehicle sign while operating on the highway. Shall not operate on the highway at a speed greater than 40 km/h.
-
CONSTRUCTION SPECIFICATION FOR PAVEMENT MARKING - Road Authority
Short term pavement markings shall be applied conforming to MUTCD and as amended by Table 1. Short term pavement markings shall not conflict with permanent pavement markings. Short term pavement markings placed on final surface course shall be of the removable type. A temporary raised pavement marker may be used in place of one 0.3 m line.
-
DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SUPPLEMENTAL
E. Auxiliary Vehicles Supply the necessary auxiliary vehicles for the operation. 653.3.03 Preparation For asphaltic concrete pavement, do not begin placement of thermoplastic striping until 30 calendar days after completion of the final surface course.
-
Chapter 4: Construction Details, Section 84: Markings
Measure the striping along the line of the traffic stripe without deductions for gaps. Use a measuring wheel or a vehicle-mounted electronic measuring device for these measurements. Areas of the standard pavement markings shown in the Standard Plans may be used in the calculations to determine pay quantities. Make field measurements where the areas are variable, such as for limit lines of different lengths.
-
Request for Quotation (RFQ) Project: Paint Truck Modification
dual color, 4-pump capable, airless, single operator, road marking machine capable of applyingindividual line widths from 2” to 12” per gun in a single pass. The herein described road marking machine is designed for multiple installation configurations and/or multiple vehicle types for installation and use. 2.1
-
DIVISION 12 PAVEMENT MARKINGS, MARKERS AND DELINEATION
marking materials at any site, whether or not related to a specific contract may be grounds for nonacceptance of a product on any project under contract. 1205-3 CONSTRUCTION METHODS Do not use handliners or any other non-truck mounted pavement marking machine to install pavement markings for long line applications of any one line longer than 305 m.
-
640 Pavement Markings - dot.state.oh.us
According to Item 641.04, long-line striping equipment for traffic paint, polyester, epoxy, and work zone markings (Item 642) shall be equipped with a computerized Data Logger System (DLS) to document long-line markings as follows: 1. Measure and record application vehicle speed to nearest 0.1 mph. 2.